 |
|
Proud Member |
|
|
 |
|
 |
David Rice - 2007

POSITION:
Lead Journeyman Electrician LICENSES:
JE-98 Journeyman Electrician CERTIFICATIONS: BICSI
ITS Installer 2 OSHA 10 Certified Certificate of
Completion of Electrical Technology High-Energy Pulse Power
Consulting CPR/First Aid Certification
QUALIFICATIONS: Completely competent in all phases of:
Residential electrical installations Commercial electrical
installations Industrial Electrical Consulting Performed
work on a variety of systems found in the petrochemical and
semi-conductor industries such as: 24 olt DC to 480
volt AC power distribution 25 UPS systems grounding
for power and instrumentation 120-277 lt lighting
120-278 Motor controls (hardwire and automated)
PLC and relay controls variety of 1:5 ratio controllers and
their loops (4-20ma, 3-15psi, etc.) variety of digital
controls variety of industrial alarm systems mechanical
controls various wire way systems above and below ground
VOM Performed work on a variety of High Energy Pulse Power
systems and High Vacuum systems: Marx Generators Design
and assembly of high voltage trigger generators Assembly and
installation of various microwave sources and wave guides
Design and assembly of control systems High power density
compact battery systems Design, assembly, and calibration of
various measurement devices (v-dot, b-dot, voltage divider,
etc.) Interlock systems (personnel and equipment) Familiar
with the design and construction of x-ray and RF screen rooms
PAST PROJECTS: Instrumentation Technologies
International, Subsidiary of Brown & Root, 97-99 Shell OP-III
Rebuild – Electrical Instrumentation and Controls
Duties:
Install Rigid Conduit
Pull Wire and Cable Shell OP-III – Capitol Projects
(Electrical Instrumentation and Controls)
Duties:
Install Rigid Conduit
Pull Wire and Cable
Field Instrument Terminations
Junction Box Terminations Shell Delayed Coker Plant – Capitol
Projects (Lighting, Electrical Instrumentation and Controls)
Duties:
Install Rigid Conduit
Install Industrial Plant Lighting
Pull Wire and Cable
Field Instrument Terminations
Junction Box Terminations
Control Panel Terminations Shell Delayed Coker Plant Shutdown
– Temporary Power
Duties:
Install Temporary Power Cabling, Panels and Transformers
Install Temporary Lighting
Perform Assured Grounding Inspections and Documentation
Zachry-Parsons-Sundt Joint Venture 7/99 to 10/99 American
Embassy Construction
Duties: Electrical Technician Austin M&C 5/00 to 8/00
Intel, Rio Rancho - Fab 7 and 9 Demo
Duties:
Removal of all electrical systems within an operating facility
Masthead International Inc. 8/00 to 2/01 Intel, Rio Rancho -
Fab 11 West Tool Install
Duties:
Install EMT and PVC Conduit
Install Various Sizes of Wireway
Pull Wire and Cable DKD 3/01: Intel, Rio Rancho - Fab 11
West Tool Install
Duties:
Install EMT and PVC Conduit
Install Various Sizes of Wireway
Pull Wire and Cable B&D Industries 3/01 to 11/02: Sandia
Laboratories MDL Capitol Projects
Duties:
Install EMT, IMC and PVC Conduit
Pull Wire, Cable and Tubing
Calibrate Instruments
Program Industrial Alarm Panel and Process Controllers
Install 'Sniffer' Fire Detectors Intel, Rio Rancho - Fab 11
West Tool Install
Duties:
Install EMT and PVC Conduit
Install Various Sizes of Wireway
Pull Wire and Cable Brown and Root 11/02 to 2/03 Shell
OP-II Revamp
Duties:
Install Rigid Conduit
Install Industrial Plant Lighting
Install Motor Control/Indication Stands
Pull Wire and Cable
Install Temporary Power Cabling, Panels and Transformers
Install Temporary Lighting
Perform Assured Grounding Inspections and Documentation
Chugach Management Services, Joint Venture 2/03 to 10/03:
Maintenance Services for Kirtland Air Force Base
Duties:
Maintain Residential, Commercial and Industrial Facilities
Maintain Interior and Exterior Lighting
Perform Preventative Maintenance Inspections
Perform Locates for Dig Permits
Install EMT, IMC, RMC and PVC Conduit
Pull Wire and Cable Fiore Industries 10/03 to 6/07:
Contract Support to ATK Scorpion I
Duties:
Build and Maintain Hardcopy File System
Establish, Build and Organize Shop Space
Build Safety Systems for Shop
Rapid Design, Assembly and Installation of Unique 'One-Off'
Parts
Design, Build, Document, Operate and Maintain Support Systems
Collect and Compile data for Physicists Contract Support to
ATK Pulse Shaped Marx Generator
Duties:
Build High Voltage Diagnostic Components
Build High Voltage Components
Rapid Design, Assembly and Installation of Unique 'One-Off'
Parts
Collect and Compile data for Physicist Contract Support to
ATK Scorpion II
Duties:
Install Electrical Power and Control Systems 'Wet Zapper'
Chemical-Biological Hazard Neutralization
Duties:
Bread-boarding circuits for rapid design
Build High Voltage and RF Diagnostic Components
Build High Voltage Components
Battery Sizing and Selection
Design, Build, Document, Install and Operate Wired Control
System
Responsible for final assembly and system checkout Two Loop
Cooled Water System for Airborne Laser Program
Duties:
Design, Build, Document and Install Water Conditioning Skid
Install Conduit and Wiring for Power and Control Systems
Install Supply and Return Water Lines
Calibrate Control Systems
Document Completed Installation Integrated Technologies
Corporation 6/07 to Present APS Network Installs and Upgrades
Duties:
Perform job tasks during all states of school operation
Support Portable moves, installs and relocates
 
|
 |

“ITC” is: Integrated
Technologies Corporation And Integrated
Training Center
The answer to every customers needs are “full turn-key solutions! This way there is no finger pointing between contractors when “something” goes wrong or doesn’t work.
- Bob Kinney 2007
|
|