Home About Us Contact Us
Welcome to ITC !
Home
About ITC
Services
Employees
Certifications
ITC Projects
Fiber Optics
Copper Cabling
Telephony
Our Partners
Employment
Contact ITC
Snow People Display
Training Center

Proud Member


David Rice - 2007

David Rice

POSITION:         Lead Journeyman Electrician
 
LICENSES:         JE-98 Journeyman Electrician
 
CERTIFICATIONS:
BICSI ITS Installer 2
OSHA 10 Certified
Certificate of Completion of Electrical Technology
High-Energy Pulse Power Consulting  
CPR/First Aid Certification
 
QUALIFICATIONS:
Completely competent in all phases of:
Residential electrical installations
Commercial electrical installations
Industrial Electrical Consulting
Performed work on a variety of systems found in the petrochemical and semi-conductor industries such as:
24  olt DC to 480 volt AC power distribution
25  UPS systems
grounding for power and instrumentation
120-277   lt lighting
120-278   Motor controls (hardwire and automated)
PLC and relay controls
variety of 1:5 ratio controllers and their loops (4-20ma, 3-15psi, etc.)
variety of digital controls
variety of industrial alarm systems
mechanical controls
various wire way systems above and below ground
VOM
Performed work on a variety of High Energy Pulse Power systems and High Vacuum systems:
Marx Generators
Design and assembly of high voltage trigger generators
Assembly and installation of various microwave sources and wave guides
Design and assembly of control systems
High power density compact battery systems
Design, assembly, and calibration of various measurement devices (v-dot, b-dot, voltage divider, etc.)
Interlock systems (personnel and equipment)
Familiar with the design and construction of x-ray and RF screen rooms
 
PAST PROJECTS:
Instrumentation Technologies International, Subsidiary of Brown & Root, 97-99
Shell OP-III Rebuild – Electrical Instrumentation and Controls
                    Duties:
                   Install Rigid Conduit
                   Pull Wire and Cable
Shell OP-III – Capitol Projects (Electrical Instrumentation and Controls)
                    Duties:
                   Install Rigid Conduit
                   Pull Wire and Cable
                   Field Instrument Terminations
                   Junction Box Terminations
Shell Delayed Coker Plant – Capitol Projects (Lighting, Electrical Instrumentation and Controls)
                    Duties:
                   Install Rigid Conduit
                   Install Industrial Plant Lighting
                   Pull Wire and Cable
                   Field Instrument Terminations
                   Junction Box Terminations
                   Control Panel Terminations
Shell Delayed Coker Plant Shutdown – Temporary Power
                    Duties:
                   Install Temporary Power Cabling, Panels and Transformers
                   Install Temporary Lighting
                   Perform Assured Grounding Inspections and Documentation
Zachry-Parsons-Sundt Joint Venture 7/99 to 10/99
American Embassy Construction
                    Duties:  Electrical Technician
Austin M&C 5/00 to 8/00
Intel, Rio Rancho - Fab 7 and 9 Demo
                    Duties:
                   Removal of all electrical systems within an operating facility
Masthead International Inc. 8/00 to 2/01
Intel, Rio Rancho -  Fab 11 West Tool Install
                    Duties:
                   Install EMT and PVC Conduit
                   Install Various Sizes of Wireway
                   Pull Wire and Cable
DKD 3/01:
Intel, Rio Rancho - Fab 11 West Tool Install
                    Duties:
                   Install EMT and PVC Conduit
                   Install Various Sizes of Wireway
                   Pull Wire and Cable
B&D Industries 3/01 to 11/02:
Sandia Laboratories MDL Capitol Projects
                    Duties:
                   Install EMT, IMC and PVC Conduit
                   Pull Wire, Cable and Tubing
                   Calibrate Instruments
                   Program Industrial Alarm Panel and Process Controllers
                   Install 'Sniffer' Fire Detectors
Intel, Rio Rancho - Fab 11 West Tool Install
                    Duties:
                   Install EMT and PVC Conduit
                   Install Various Sizes of Wireway
                   Pull Wire and Cable
Brown and Root 11/02 to 2/03
Shell OP-II Revamp
                    Duties:
                   Install Rigid Conduit
                   Install Industrial Plant Lighting
                   Install Motor Control/Indication Stands
                   Pull Wire and Cable
                   Install Temporary Power Cabling, Panels and Transformers
                   Install Temporary Lighting
                   Perform Assured Grounding Inspections and Documentation
 
Chugach Management Services, Joint Venture 2/03 to 10/03:
Maintenance Services for Kirtland Air Force Base
                    Duties:
                   Maintain Residential, Commercial and Industrial Facilities
                   Maintain Interior and Exterior Lighting
                   Perform Preventative Maintenance Inspections
                   Perform Locates for Dig Permits
                   Install EMT, IMC, RMC and PVC Conduit
                   Pull Wire and Cable
Fiore Industries 10/03 to 6/07:
Contract Support to ATK Scorpion I
                    Duties:
                   Build and Maintain Hardcopy File System
                   Establish, Build and Organize Shop Space
                   Build Safety Systems for Shop
                   Rapid Design, Assembly and Installation of Unique 'One-Off' Parts
                   Design, Build, Document, Operate and Maintain Support Systems
                   Collect and Compile data for Physicists
Contract Support to ATK Pulse Shaped Marx Generator
                    Duties:
                   Build High Voltage Diagnostic Components
                   Build High Voltage Components
                   Rapid Design, Assembly and Installation of Unique 'One-Off' Parts
                   Collect and Compile data for Physicist
Contract Support to ATK Scorpion II
                    Duties:
                   Install Electrical Power and Control Systems
'Wet Zapper' Chemical-Biological Hazard Neutralization
                    Duties:
                   Bread-boarding circuits for rapid design
                   Build High Voltage and RF Diagnostic Components
                   Build High Voltage Components
                   Battery Sizing and Selection
                   Design, Build, Document, Install and Operate Wired Control System
                   Responsible for final assembly and system checkout
Two Loop Cooled Water System for Airborne Laser Program
                    Duties:
                   Design, Build, Document and Install Water Conditioning Skid
                   Install Conduit and Wiring for Power and Control Systems
                   Install Supply and Return Water Lines
                   Calibrate Control Systems
                   Document Completed Installation
Integrated Technologies Corporation 6/07 to Present
APS Network Installs and Upgrades
                    Duties:
                   Perform job tasks during all states of school operation
                   Support Portable moves, installs and relocates

 


 
 
 


“ITC” is:
Integrated
Technologies
Corporation
And
Integrated
Training
Center




The answer to every customers needs are “full turn-key solutions! This way there is no finger pointing between contractors when “something” goes wrong or doesn’t work.
- Bob Kinney 2007

 

 

 

         
Home | About Us | Contact Us | Philosophy | Integrated Training Center
Copyright 2009 Integrated Technologies Corporation. All rights reserved
Website designed and maintained by Dream City Consulting